concrete coverings outside steel
Answer Posted / ajay kumar
Concrete covering out site of steel
Slab=15 mm
Beam =25 mm
footing = 50 mm
column =40 mm
Is This Answer Correct ? | 1 Yes | 0 No |
Post New Answer View All Answers
How much of the strength of concrete comes from post- production curing?
For sloping slabs or sloping beams why the tension steel from either side of ridge is taken into compression zone of other side?
why & what is perchatage we are using fly ash in concrete?
pls tell estimate for 1 kilometre length random rubble masonry 0.90 metre height 0.600 metre width
what is the list of building construction equipment & teir output?
04. a. Slenderness ratio…………… 1 b. If the height of a stage is 15-0 & dia. of the prop is 5, the slenderness ratio is….… 1 c. If the height of a stage is 10-0 & dia of prop is 3, the number of bracing will be…… 1
Pile height is 4.3m. 2nos. under reammer. bulb nose is 75mm and height is 400mm. pile dia is 375mm and overall dia 940mm.pls. help to calculate concrete in pile and bulbs separately. What is formula for bulb volume calculation ?
Define angular dimension?
Method of findingthe dry ingredient quantity of 1 m3 concrete. what is the difference between static and dynamic induced emf? Testing charges bill given for Rs. 32,000/- but not added service tax in this bill. So, How much TDS will be deduct
What is the difference between Rock And Murrum. How to claim that excavated material is not a murrum but rock.
a concrete mix 1 2 4 by volume with water cement ratio as .6 by weight if moisture content in F.A is 6% with 20% BULKING AND IN C.A 1.5% by volume. find quantities of different materials required for one bag of cement
mix design procedure for 1:6 cement mortar
What are advancements in civil engineering?
How much quantity of cement Bag for block masonry (1:4) for 1 cu.m? Block size (150x200x400) Mortar Thickness 20mm
significance of specific surface area of particles?