polavaram project is situated inwhich place?

Answer Posted / basheer

near polavaram project on godavri near by talluru village.

Is This Answer Correct ?    0 Yes 0 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

how to absorb to site basic corrections? which are the important correction?

993


how to prepare site mix design

1551


In jack arch floor, the rise is kept?

708


I have an plot with area 35*47 = 182.77 sq yards. Out of this iam planning to construct house with 1350 sqfeet each floor .iwanted to build a G+2 house.Need cost estimation for each item

1400


How do you compute the volume of airflow?

678






Why does the pressure increase under soil?

649


plz drive the formula d2/162.162 for the calculation of weight of steel bars????

36347


what is spacing of wallar support of 3m column. the thickness of column is 0.25 m.

1737


brickwork labour rate per cum ?

1105


Could you please give me an answer to the mixing proportion of concrete M1 grade (sterngth of 1 MPa)?

2123


what are the types of dimensioning?

1729


How we calculate the service time of buildings

1423


Different sizes of Hollow blocks and its weight. Thanks.

1922


How cracks in concrete can be avoided?

641


With reference to construction of state highways, please let me know the total Bill Of Quantities as per the following details:- 1) Subgrade - 500 mm 2) Granular Sub-Base (GSB) - 200 mm 3) Wet Mix Macadam I (WMM I) - 150 mm 4) Wet Mix Macadam II (WMM II) - 100 mm 5) Dense Bituminous Macadam (DBM) - 60 mm 6) Bituminous Crust (BC) - 40 mm Road Length is 44 Kms. Road Width is 7 mtrs. Please provide the BOQ of each layer as per Compacted Factor & Loose Factor both. Also, if possible please provide me the approximate details of total material required (all categories viz. soil, gravel, stone aggregrate, sand, bitumen etc.) as per general mix design prevailing in India. Thanks & Regards -- Rokr

1943