Answer Posted / basheer
near polavaram project on godavri near by talluru village.
Is This Answer Correct ? | 0 Yes | 0 No |
Post New Answer View All Answers
how to absorb to site basic corrections? which are the important correction?
how to prepare site mix design
In jack arch floor, the rise is kept?
I have an plot with area 35*47 = 182.77 sq yards. Out of this iam planning to construct house with 1350 sqfeet each floor .iwanted to build a G+2 house.Need cost estimation for each item
How do you compute the volume of airflow?
Why does the pressure increase under soil?
plz drive the formula d2/162.162 for the calculation of weight of steel bars????
what is spacing of wallar support of 3m column. the thickness of column is 0.25 m.
brickwork labour rate per cum ?
Could you please give me an answer to the mixing proportion of concrete M1 grade (sterngth of 1 MPa)?
what are the types of dimensioning?
How we calculate the service time of buildings
Different sizes of Hollow blocks and its weight. Thanks.
How cracks in concrete can be avoided?
With reference to construction of state highways, please let me know the total Bill Of Quantities as per the following details:- 1) Subgrade - 500 mm 2) Granular Sub-Base (GSB) - 200 mm 3) Wet Mix Macadam I (WMM I) - 150 mm 4) Wet Mix Macadam II (WMM II) - 100 mm 5) Dense Bituminous Macadam (DBM) - 60 mm 6) Bituminous Crust (BC) - 40 mm Road Length is 44 Kms. Road Width is 7 mtrs. Please provide the BOQ of each layer as per Compacted Factor & Loose Factor both. Also, if possible please provide me the approximate details of total material required (all categories viz. soil, gravel, stone aggregrate, sand, bitumen etc.) as per general mix design prevailing in India. Thanks & Regards -- Rokr