Describe why concrete must be compacted after it is poured?
Answer Posted / chandrakant sidusare
To prepare the full strength of concrete and removing the porosity from concrete
| Is This Answer Correct ? | 12 Yes | 0 No |
Post New Answer View All Answers
In an aggregate blending plant, water is sprayed before blending is performed. If the fine content in aggregate is as high as 25 %, will not the fines form into lumps / balls and distribution will not be uniform ? Further, the fines will stick onto the interior of pug mill and its content will be low. The mixed material is stockpiled for weeks / months before use. Will it not be better that blending is done in dry condition, and water will be added only during compaction at site. Please forward your comments and suggestions.
How to calculate Volume of Wet cement concrete for a specific grade?
Can inverted beams used in pipes during construction?
WHAT R THE GENERAL TECH QUESTIONS ASKED FOR THE INTERVIEW FOR AN AUTOMOBILE INDUSTRY,SPECIALLY DESIGN DEPT
What are the advantages of building a dam on the river nile?
how to find quantity of concrete in PCC M15
How to identify the vitrified tile and ceramic tile by observation only after executing the job.
what r the precaution for high in atp tempareture,low in atp tempareture
it is a corrected question." make a list of engineering property(properties) of soil.
detailed calculation of the amount of cement used?
How to calculate(Thumb rule) the consumption of steel per cubic meter for different concrete members.
how find the cut length of tringular ring and any formula find out the quantity of circular brick work
Providing ,Cutting, bending and positioning of TMT Bar with cost of binding wire
How to calculate dry of volume of concrete constant?How it comes 1.54 or 1.57
Moisture content calculation for diff mix ratio's ??