Describe why concrete must be compacted after it is poured?

Answer Posted / chandrakant sidusare

To prepare the full strength of concrete and removing the porosity from concrete

Is This Answer Correct ?    12 Yes 0 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

HDPE pipe standard bends using for TSE irrigation? is it possible to use 30 degree?

1732


what is the difference between replacement of cement by groundnut shell ash

2506


how u design STAGING for Superstructure in BRIDGE construction?

1892


I Want To Know Quantity of Cement Conc. & Sand in Column of 9"x9"x10'

2040


Explain major differences between routing maintenance and major maintenance.

652






what is the breaking strength of wall tiles

1940


Mention what are the composition of a landfill?

722


how do you calculate the quantity of steel,cement for plinth beam. (example size 41'*0.58'*1.08')

2176


Can anybody help by describing each and every step in short, used while giving a building layout by total station? Regards

1578


how to absorb to site basic corrections? which are the important correction?

990


How to arrive the co- efficient of all civil activities? For ex:- painting-enamel in wooden doors. co efficient is 1.8. How this is calculated

1692


For the calculation of bearing pressure below the footing, to know whether it is below the safe bearing pressure of the soil, the unit of RCC below ground level to be taken is 25 KN/m3 or (25-15)KN/m3, where 25 is the unit weight of RCC and 15 is the unit weight of soil and whether the weight of backfilling to be taken?

1769


how to balance aggregate during mix design of concrete???? how to calculate moisture content like C/A,F/A and how many percentage using ice instead of water for example of we are preparing ice concrete??????

1449


What is a kip?

712


what is conventional shuttering rate per square feet of built up area? what is Mivan shuttering rate per square feet of built up area? what is coupler shuttering rate per square feet of built up area?

4457