Answer Posted / er aamir
in the above question, its asking for word not letter. so always give concentration on words..
| Is This Answer Correct ? | 0 Yes | 0 No |
Post New Answer View All Answers
Analyze the rate for 1st class brick work in superstructure with 1:6 cement sand mortar. Consider 1000 cu.ft quantity and work out the rate per cu.ft
Difference between pre-tensioning and post-tensioning.
what is the amount of absorption of slurry in shuttering ply board. what is the amount of slurry leakage allowed for 1 m3 of concrete.
Cement consumption of one cubic meter of aerocon blocks masonry?
what will be the cost of thickness of 125mmor rcc measurement of 52x33.75 feet
I HAVE APPLIED FOR 20TH UES ARMY. I WANTED TO KNOW WHEN WILL I RECEIVE CALL LETTER FOR THE SAME.
How much river sand contain the 6 & 10 wheeler truck? Or Maximum sand that any type of truck carry?
50 acre of land to be reclaimed for an average height of 2.5 mt. Dredging area is 500mx200m size. what is the dredging depth required to reclaim the area?
how many kg cement & fine sand reqird in one sq meter 1:6 mortar ratio?
What is the l/d ratio of cantilever beam?
how many monpower required for 1 sqm normal RCC structure ( includes finishes & MEP )
what is the mode of method of face bar measurement
What is the purpose of Chipping in the heavy foundation?
Why are separation membranes used between concrete pavement slab and sub-base?
HOW SOON CAN YOU TRAVEL DON TO ANY LOCATION POSTED U?