Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

how much kg of binding wire is used in slab ?

Answer Posted / naresh

with 18G binding wire 10Kg/MT (minimum) will be used in slab, beam &

Is This Answer Correct ?    2 Yes 2 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

What sizes of stones chips are used for foundation, column and floor casting. Please answer in detail.

2053


How to decide/consider the grade of bitumen for dbm.

2179


How many days should curing of plastering, brick work and concrete

1623


Ratio for 4500 psi concrete

1573


CAN V USE CRUSH SAND FOR CLAY BRICK MASONARY

1086


quantity of sand and cement for 10m2 plastering 10mm thick for the ratio of 1:4,1:3and its leabour data

3107


rate analysis for cement pointing 1:4 , for 100 sq m

4124


How is calculate the cube molt

2215


what is the steel difference between np-2 and np-3 pipes and weight also

2084


What quantity of 1.0 m3 bricks required?

1056


Dear Engineers, Can you please advise me the material requirement to construct a room 4 M x 4 M 1. No. of Standard Brick 2. Requirement of Cement Bags 3. And Concrete for Steel, Cement, sand, etc Thanks

1925


percentage of metal,clay or soil & water in water bond macadam roads to know the quantities for each in total volume of 11500 cubic meters

2097


What is the force exerted by the tacoma narrows bridge?

1177


Analyze the rate for 1st class brick work in superstructure with 1:6 cement sand mortar. Consider 1000 cu.ft quantity and work out the rate per cu.ft

1838


What is need for setting limits?

1085