Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

On concrete surface 1sq.ft area hacking no's of hack?

Answer Posted / s.k.s

36 Nos. with distance of c/c of 2.5 cm apart.

Is This Answer Correct ?    0 Yes 0 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

how to calculate the length diamond shaped striupps in column

2729


What is the difference between built area and super built up area?

1224


I used Etabs software to analyse a high-rise building. And I want to use templated UBC-codes inside to calculate the Seismic load. My question is: whether or not I have to control the seismic load by base shear load which is manual calculation? (just for more clarification: I can control this by input the scale factor into Eartquake definition in Etabs) I would highly appreciate your answer.

6061


Thumb rule for steel qty for 1m2 in kg/m2 column slab footing beam

5604


How to activate isometric axes in cad?

1200


One plate (women civil worker lifting Plate - Satti) sand measures how many cubic feet?

2354


Which architectural movement is also known as jazz moderna?

1315


what are the layers of the national and heir aprox thickness??

2120


What ingredients with% found in ppc cement??

2115


how to calculate the strength of rebound hammer test reading in building construction ?

3344


What is the purpose of the gap in the road on this bridge?

1292


Steel requirement in kg of 6" thk slab Total qty 32.64 m3 Beam / column qty 35.39 m3

2073


1.How much batten required for 1 sqm Shuttering. 2.how much pipe & clamps required for staging of 100 sqm shuttering at 5.0 m height.

2283


i just want to know how much require sand and cement for 1 sq.mt including wastage. Please guide me as soon as possible. 

1898


What is factor not to be taken in consideration in mix design?

3643