Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

What is the ratio of Grades M10,M15,M20,M25,M30,M35,M40.

Answer Posted / kalu chizaram

m5 = 1: 5: 10
m7.5 = 1: 4: 8
m10 = 1: 3: 6
m15 = 1: 2: 4
m20 = 1: 1.5: 3
m25 = 1: 1: 2
m30, m35 and above shd be control.

Is This Answer Correct ?    69 Yes 13 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

What is limit state method and working stress method and ultimate method

1634


A sieve analysis results in 100% retained in no. 50 Sieve, the fm is?

1263


What is the formula for figuring out how many gallons of water are in a pipe by the foot?

1142


What is the snap size in civil and how can we create it?

2782


Define What is the origin of name Railway Sleepers?

1296


what is the soil bearing capacity for a 5 floor multistorey residential building and which type of soil ? what is plinth beam? in wall load calculation center to center column distance is considered or not/

2296


What Reinforcements Are Used In The Process Of Prestressing?

1349


what is the water cement ratio? how to calculate it? list the wt. of constructions materials including concrete both ordinary and light wt. concrete

2314


What are the types of slump?

1189


how can can column be corrected when the design is not safe ? is the increasing the clearcover a solution?

1631


reinforcement slab, beam and column formulas?

2698


how to find quantity of concrete in PCC M15

2146


What is aggregate?

1138


 Describe a time when you anticipated potential problems and developed Preventive measures

3321


With reference to construction of state highways, please let me know the total Bill Of Quantities as per the following details:- 1) Subgrade - 500 mm 2) Granular Sub-Base (GSB) - 200 mm 3) Wet Mix Macadam I (WMM I) - 150 mm 4) Wet Mix Macadam II (WMM II) - 100 mm 5) Dense Bituminous Macadam (DBM) - 60 mm 6) Bituminous Crust (BC) - 40 mm Road Length is 44 Kms. Road Width is 7 mtrs. Please provide the BOQ of each layer as per Compacted Factor & Loose Factor both. Also, if possible please provide me the approximate details of total material required (all categories viz. soil, gravel, stone aggregrate, sand, bitumen etc.) as per general mix design prevailing in India. Thanks & Regards -- Rokr

2463