Answer Posted / amreesh
1 m = 3.28 ft
so 1 m3 = 3.28x 3.28x 3.28 cft
say > 35.29 cft
| Is This Answer Correct ? | 3 Yes | 0 No |
Post New Answer View All Answers
Define What is the meaning of a blue land surveyors flag?
Why do we not deduct steel volume to find actual volume of concrete in practical as we have studied that,,, actual volume of concrete = volume of column- volume of steel pls explain with reference of IS code?????
Cut Linten (RCC-1:2:4)on 10" wall - what should be the width and hight of cut Linten? Secondly, 1 X 1.6 foot,4" thick window sun/rain shed (Chajja)should consume steel,Cement, sand and Stone chips?
I Want To Know Quantity of Cement Conc. & Sand in Column of 9"x9"x10'
What are the ingredients of pre-stressed concrete?
When column of building is abutting the boundary line,then suitable footing advised is
Hi I had missed my mark list (first year-apr2003)how i search in my old mark details in internet and which web site? pl inform me in full details..
How do you measure water flowing through 300mm diameter pipes?
how lap length is increased with increase of Grade of steel?
pls tell me about method of cutting length of ties column
in levelling operation the first site on any change point is back site the second site on any change point is fore site the line commenses with fore sight & closes with backsight the line comensses with back sight & closes with fore sigh
What is the maximum strength of cub compress strength in one cub testing
I just got a first job in Maharashtra and m a fresher. My task is estimate the cost of excavation of earth with J.C.B. can anyone tell me how to do this??
manhole chamber having height of 2300 mm and thickness of brickwork is 230 mm and dia of opening covering is 560 mm and bottom length vertical is 1500 mm (1:4) brick masonry and plaster 12 mm on both sides..how to estimate the no bricks used with mortar cement bags and sand for total chamber including plaster.
How much is the cover for slab?