Answer Posted / amreesh
1 m = 3.28 ft
so 1 m3 = 3.28x 3.28x 3.28 cft
say > 35.29 cft
Is This Answer Correct ? | 3 Yes | 0 No |
Post New Answer View All Answers
Which code is used for tor & tmt steel bar?
What is chemical composion test
what quantities of work done in terms of sq.mts/day/ of 8hrs for each varpenter (shuttering) and Steel fitter in terms of Tonnes. For slabs, Columns etc.?
5. Two long boundary walls run parallel to each other at a center to center distance of 1 meter apart. The width and height of the first wall are 0.30 m and 2.5m respectively. While those of the second are respectively 0.18m and 3.5m. Plot the distribution of vertical stress intensity due to walls on a horizontal plane, 1m below ground level. The walls have negligible depth of foundation and are made of brick masonry (y = 19.2 kN/m cu)
what is floating slab foundation?
Please send me the qunty. of mason/labour required in each day for different type of civil construction work?please send me ans. in my mail.my mail id is (parthamitra086@gmail.com) or here.
How many days should curing of plastering, brick work and concrete
how to calculate the mortar for 10'*10' size room for both plastering and for masonry work?
what is the breaking strength of wall tiles
Explain the difference between slab and beam?
five benefits of using standard terminology in the measurement process
Describe about the Pile test methods, which are used in Industrial & Multistory Buildings in general.
Why steel rods are produced only in even dimensions?
What is the difference between Grade I, II and III of GSB?
what is the difference between tsp & tower