Answer Posted / ananth krrish
1m^3= 1m(L)* 1m(B)* 1m(H)
1m= 3.28ft
therefore : 1m^3= 3.28ft^3= 3.28ft(L)* 3.28ft(B)* 3.28m(H) =35.287ft^3
Is This Answer Correct ? | 1 Yes | 0 No |
Post New Answer View All Answers
Explain what is the release of lien?
In how many types u can do POP on ceiling and walls(on which material or by using which material)? b) what is the difference between dry , oil bound, enamel, acrlyic type of painting? 2nd :- I have certain queries, please help to solve. a) length of pile bore is 4m.excavation quantity will be area * length where area will be pi/4 * dia*dia. Is this right? b) It is a single reamed pile of 300m dia and reamed dia is 750mm. can any body help me to calculate excavated quantity of this bulb(reamed section),, concrete quantity in bulb with showing the formulas to be used?
What is reinforced concrete?
What are the advantages of cad software’s?
is concealed wiring a problem in fly ash brick wall?
pls mail some more tecnical qustions at msaranya2610@gmail.com
Explain how you can turn off the display for dimension in CAD?
how many numbers of 4inch bricks and get consumed in 9 inch BB masonary wall in cubic feet.plz send my below e.mail adress
What is missing report and how to prepare
In tower foundation, on the time of 3 mtr pit RCC casting if water and mud is their surface of PCC then what will be do?
sir how can we find the cement and sand required for making 4" drop
What ingredients with% found in ppc cement??
Define What are the reasons for geotechnical site investigations in Uganda?
what is the difference between np2 and np3 concrete mix
What is a tensile strength? What is the tensile strength of wood?