1 m^ 3 of concrete 150 x150 mm of spacing of
required of steel ?
Answer Posted / dinesh koli
What is the dia of dar
Is This Answer Correct ? | 1 Yes | 2 No |
Post New Answer View All Answers
What are the phases inspections are done by local authority while construction?
Kindly post me previous year interview questions with answer for post of Manager (civil engg.) for NTPC, IOC , GAIL etc. I have interview on july 2013.I will be very grateful to you. Please guide me.
what is the cost differene of a same structure when it is constructed with brick masonary, and when it is constructed with concrete as a frame structure.????????
Where will be the maximum bending moment in a TEE Beam?
1) write Short notes about Shellow & Deep well? 2) What is the full form of SPT & SMB? write short notes. 3) write short notes about efficiency of Riveted joint.
Define What materials were used to build the Golden Gate Bridge?
What is the distance between railway tracks?
strength vs shape factor
A 16 pile group, consisting of diameter concrete piles, were cast in situ in a clayey soil whose unconfined compressive strength is 1100 psf. Each pile is 60 ft long and the pile spacing is 2.5 times the pile diameter.The water table is at the ground surface and saturated unit weight of the clay is 118 lb/cu.ft. using a factor of safety 3 and a reduction factor =0.45, compute the allowable capacity of the piles acting as individuals
how much deduction will be in 32 mm dia HYSD steel bar for 45 and 90 degree bend
For the calculation of bearing pressure below the footing, to know whether it is below the safe bearing pressure of the soil, the unit of RCC below ground level to be taken is 25 KN/m3 or (25-15)KN/m3, where 25 is the unit weight of RCC and 15 is the unit weight of soil and whether the weight of backfilling to be taken?
What is meant by cad?
Why reinforcement done in shorter span in two way slabs
How many hours should traffic be not allowed after completing wbm road or bst.and min how many hours should road rollers be used.
how to calculate the rebar depth if forgot the foundation reinforcement (main steel)? is that any calculation or formula we have data sheet of supplier what depth what is the pull out capacity is mensioned in data sheet. if any IS code than its help full to me.