During shutdown of Steam Turbine,How do we cross the
critical speed?
Answer Posted / chanchal rajput
As we closed esv after that speed of the turbine goes to
slow down automatically we can not any thing as it cross the
critical speed , for short time vibration increase but after
that goes slow down and turbine stop .Some turbine run above
the critical speed and some below the critical speed .
| Is This Answer Correct ? | 0 Yes | 10 No |
Post New Answer View All Answers
what is the trip circuit supervision in an electrical meaning?
explain how the third harmonic content of the magnetising current affects transformer design
can dp type level transmitter work in under vaccum condition
dear sir i have completed one year post diploma certificate in thermal power engineering from national power training institute durgapur ...plz suggest me for power sector job
what is the basic use of power plant in equipment
DCS marshaling Cabinet Power supply can be replace during plant running time? Answer Yes it is possible. I am talking about the controller and cards power supply modules. They are always redundant and connected through diode so that if one power supply fails the other can take the charge immediately.so it is possible to replace one of them in running plant if the other one is healthy. MY question is how switching done.
why is the in steam turbine axial displacement of active side thrust pad is positive and non active side thrust pad is negative.
How We Calibrate the vaccum transmitter?
How to calculate boiler capacity? I have 1 Autoclave, Which has to use for AAC block. Dimension for this Autoclave is - 13 Meter Length & 2.2 Meter Diameter.
what is restricted earth fault explain in details
Qatar Fertiliser Company (QAFCO) Shortlisted me for interview (got the intel from my source) for Field Operator- Utilities post. Please let me know what kind of questions they asked? ... this position requires 5 years of experience in Power Plant and background Diploma in Electrical/ Mech. ... my Background is Electrical and I am a sub Assistant Engineer (Operation) at a private HFO based Power plant... PS: Please Let me know what preparation should I take to obtain the Interview which will be take place In Bangladesh soon
Why superheated are started before I'd and rd fan?
By any way can we increase the B check hours from 300 to 500
Looking for Bently Nevada surplus 3300/52-01-00-00 Reverse Rotation Monitor , 4 pieces.
some one can tell me how residual type excitation is provided through transformers to an AC generator without any battery or PMG&excitor