For M25 concrete ,what is the maximum compressive strength
at 28 days ?
Answer Posted / vigneshkumar.m
above 25 N/mm
| Is This Answer Correct ? | 3 Yes | 5 No |
Post New Answer View All Answers
i have applied 40mm spacer in the concrete for tie beam. is it correct? kindly give me if there any code available
How much Tolerance factors like 1. brick work 2.plaster 3.painting 4.floor tiling 5.wall tiling 6.shuttering 7.concreting 8.steel
how much deduction will be in 32 mm dia HYSD steel bar for 45 and 90 degree bend
Labor requirement for each item needed? Lean Concrete 103.550m3 Concrete for Foundation and Structure 1753.000m3 Expansion joint 288.000m Contraction joint 127.000m Dowel bar 450.000m
Define What is the distance between railway tracks?
In foundation design, while we do the base pressure check, we normally check if the attained pressure value is less than the GROSS BEARING CAPACITY of the soil which is the sum of net bearing capacity of soil and the overburden pressure. Actually, the overburden pressure acts against the net bearing capacity of the soil and I feel that we are actually increasing the bearing capacity value and doing the check. I feel that this is NOT right. Please clarify on this.
is there any codal provision for soil cousion over the Hume pipe of Dia 1.2 m.
Explain what are the phases inspections are done by local authority while construction?
what is castigliano theaorem
how do we design mix ratio?
What was asked in isro civil interview
what is Brick crushing strength(PSI)?
Q 1) 1 Mason and 2 LABOUR / _________CUM brick work Q 2) 1 Mason and 1 LABOUR / _________SQ FT Plaster work Q 3) 1 Carpenter & 2 Labour/_________SQ FT shuttering work Q 4) 100 SQ FT roof slab concreting ____________mason and labour required
1. 1. The mass of a chunk of moist soil is 34 Kg and its volume is 0.012 cu. Meter. After drying in an oven, the mass reduces to 14.25 Kg. Determine the water content, the density of moist soil, the dry density, void ratio, porosity and degree of saturation. Take G = 3.25
how clculate excavated or backfilling quantity by simpson's rule