HOW MANY CEMENT BAGS ARE REQUIRED IN 1 CUBIC METER
Answer Posted / dhanya
in 1 m3 28 bags are there(since 1 bag=50kg)
| Is This Answer Correct ? | 2 Yes | 3 No |
Post New Answer View All Answers
we have a crushing plant and our product is experiencing flakiness and elongation over limit for granite. what is the solution to this problem? how can it be avoided and what to do differently? It is not ok for batching plants
material used for mendrel use to bend epoxy coated rebar
What is geopolymer based concrete?
How is improve my knowledge in construction industries....
how beam.coloum ,slab, footing are designed as per indian code.. detail procedure?
What are the different types of runners?
2. What are the advantages of your present job, things you like about it?
What is the meaning of Brick- M 35 grade? Is it a common brick or it's a concrete brick?
What is the likely strength of a 1:2:4 concrete mix?
a sewer which receives the discharge of no. of house sewer is called house sewer lateral sewer intrcepting sewer sub-main sewer
how to find ssm in foundation?
WHAT DLC DESIGN IN CONSTRUCTION
what is anchorage length,lap length and (dont remember the last one)
What is difference between code and standard and specification?
With reference to construction of state highways, please let me know the total Bill Of Quantities as per the following details:- 1) Subgrade - 500 mm 2) Granular Sub-Base (GSB) - 200 mm 3) Wet Mix Macadam I (WMM I) - 150 mm 4) Wet Mix Macadam II (WMM II) - 100 mm 5) Dense Bituminous Macadam (DBM) - 60 mm 6) Bituminous Crust (BC) - 40 mm Road Length is 44 Kms. Road Width is 7 mtrs. Please provide the BOQ of each layer as per Compacted Factor & Loose Factor both. Also, if possible please provide me the approximate details of total material required (all categories viz. soil, gravel, stone aggregrate, sand, bitumen etc.) as per general mix design prevailing in India. Thanks & Regards -- Rokr