How to calculate lap,bond and hook length for preparing bar
Bending schedule ?
Answer Posted / syed mohd. fareed
Hook - 9d (d- dia of bar)
Bent up - 0.42D (D- centre to centre vertical distance between bent portion and bar )
Lap - 50d (d-dia of bar)
| Is This Answer Correct ? | 50 Yes | 12 No |
Post New Answer View All Answers
what is the procedure involved in preparing mix design of m15 grade as per IS-10262-1982
pile load testing procedure
What is the maximum crushing load in Kg & crushing strength in N/mm2 for M25 & M 15 Grade concrete
what is work of planning deptt. in any construction compny (in road project)
What is the zero value in quantity surveying
.5Ast
What is type failure of road surface? how to repair the failure of road surface?
how to take concrete quantity for precast segment for viaduct project?
A Cat excavator loader of 3Lm*3 heaped capacity bucket is to be used to load blasted rock directly into a crusher of capacity (consumption) of 100L
How did the romans get water up hills using aqua ducts?
what is stressing
which has high compressive strength between hollow block and brick masonry?
how to calculate cost of raw materials of a building for 1000 sqft & also consolidated cost of labour in a 1000 sqft building
why is the column design?
plz.show development and anchorage length in simple diagram.