Answer Posted / prabhakar trimukhe
550 nos bricks are required in 1 cum and with cement mortor(.20x.20x.10 m)
without mortor 500 nos
| Is This Answer Correct ? | 0 Yes | 5 No |
Post New Answer View All Answers
At what point does a circle start losing area when being flattened?
How do we calculate absolute pressure?
what is difference between fluidity and workability also how palsticizer works
how to determine H- zone in a column? where it will occur?
What is binding spacing of the rebars at lapping zones.
i have a interlock pavement work.i need to compact about 2000 sq metres of sub base grade c of thickness 15 cm.what is the amount of water required for compaction ??
why we are using stub column..? is it possible to construct steel stub column..?
Why is the statue of liberty made of copper?
can any one explain bar bending schedule of bems and columns and slabs ??
what is relation between SPT N value and driving piles after conducting a soil test?
how to prepare site mix design
can stub column take the load as main column
What is the software used in civil engineering?
What is absolute coordinates?
Explain what are the phases inspections are done by local authority while construction?