How much wastage we considered for cement

Answer Posted / prabhakar trimukhe

i think 2% of quantity of the material

Is This Answer Correct ?    2 Yes 3 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

How many square meter can a worker/labor demolish a structure per day?

1513


how do we design mix ratio?

1419


What is the density of DLC & PQC and how it is differ from normal concrete?

2995


what is column foundation

1830


How is calculate the cube molt

1784






) Design a gussetted base for a column section consisting of one sc 250 with two cover plates 300 x 25 mm carrying an axial load of 2500 KN. The S.B.C. of soil is 250 KN/m2 and the permissible bearing pressure on concrete is 4000 KN.

2247


What is OSHA compliance?

687


If 40 backlogs are cleared m finally with 65 percent marks . Am I eligible to get visa to US

1291


What is the standard specification of MOR and Water Absorption of Homogenous Ceramic Floor Tiles?

1771


What are the responsibilities of a site manager?

619


For plate load test why we are applying pressure 3 times the proposed allowable bearing pressure? Is there any supporting standards for this?

1336


I just got a first job in Maharashtra and m a fresher. My task is estimate the cost of excavation of earth with J.C.B. can anyone tell me how to do this??

1325


IN Compression testing machine 1division =10KN ,then what is compressive strength of 100*100 mm cubes at a load of 320 KN

1369


What are some structures that may be subjected to fatigue?

653


What is binding spacing of the rebars at lapping zones.

609