what will happen to the core losses if we perform the open
ckt test on high voltage side of a transformer ?
Answer Posted / eswara rao ch
Nothing but if we made the measurement on HV side it requires HV meters to find the same iron losses as found in LV side test which cause difficulty & expensive.
Is This Answer Correct ? | 0 Yes | 0 No |
Post New Answer View All Answers
can anybody tell me that for p.f. Improvment we use capacitor banks but how to decide its capacitance. As we all know how to calculate kvar but what abt capacitance value
Incoming line 11kv And transformer capacity is 2500kva. Consumption load is 1300A. Then fuse capacity is 11kv line.
what are the difference between PLC and embedded
Dear all: Recently we got a question about Interface between PMS and SAP-PM.once we got a update message from PMS.we should set the deletional flag for functional location in SAP system.Is there any FM or BAPI to use?There are only functional location create and change provided by SAP. Best regards!
Where can I get Iidian straderd specifications for electrical items or works in web? please help me.
What is the reason that the humming sound is coming from the induction furnace panel?
How many double suspension hardware fittings are required on a double circuit transmission tower?
What are the two types of compensation?
How to do cable sizing calculation for 750 A Neutral Earthing resistor for 33kv. the 33kv cable going to swbd. is 630mm2 3 runs.
what is a vector protection in transformer
What size cable (based on voltage drop) is required to supply a 40 A three phase boiler if the wiring system is 75V single insulated cables installed in non-metallic rigid conduit 56m from the main switchboard? Voltage drop in the consumer's mains is 8V.
What is voltage ratio of a transformer?
What is the difference between earthing,ground&nutral?
How to Calculate the Fault Level of Electrical Installation
How to synchoronize the generator (with gcb,GT) to grid????? ????? from Grid iam getting power (rated 400kv/20kv) through GT and its goes to UAT.,,ST.,, now my generator(rated 20kv ) ready.,, now iam closing my GCB.,, in GT iam suddenly giving 20kv on that Gt.,, what will happend