Answer Posted / james
A short definition of maintenance planning and scheduling:
Planning decides what, how and time estimate for a job. Scheduling decides when and who will do the job. Planning of a job should be done before Scheduling a job.
| Is This Answer Correct ? | 14 Yes | 0 No |
Post New Answer View All Answers
which processor is used in dcs.
In which principles tx ,pressure gauge,Temp gauge,control valve works?
how to do dynolab wind speed sensor loop test, how to simulate value,i have simulate mA 4-20mA but not responding in DCS faceplate, please kindly advice me any one.
What is the GK Value in Flowmeter?
What is hp & mp seperator .& what is its working principle ?
HOW TO SOLVE PROBLEM WITH ENRAF LEVEL TRANSMITTER 854 ATG THAT PASSWARD DO NOT Exist INTO TRANSMITTER TO ADJUST LEVEL WITH PORTABLE PET 847, WRITTEN WRONG PASSWORD , I AM SURE THAT DEFAULT PASSWARD (W2=ENRAF2) IS THIS TRANSMITTER NEED TO REPLACE SOFTWARE AND HOW?
whats the abbreviation of IOP? is it instrument of power or input open problem?
where proximity sensor installed on tank in loading arm application
Explain Gas Turbine startup and shutdown sequences
hii my name is sujith...i am preparing for HPVL GET 2010... so ,,,pls help me by send any previous questions or material to my site.....(Msujith_12@in.com) thank q
Tell me the field calibration procedure step by step with diagram of pressure gauge, pressure switch, pressure transmitter, temperature switch, level switch, flow switch, flow transmitter.
Explain the mechanism behind the turbine meter.
Why use ball valves on Gas pipelines instead of gate & or globe valves...means basic diffrence or use of these valves..how designers knows this type of valve with rating is required...
how is work pressure switch& level switch?what is the principle of this?
1)How many tpes of vibration probe and how many tpyes of vibration. 2)how we can calibrate a vibration probe with tk3 3)what is RMS value in vibration measuring application and how we calculate it.