what is the meaning for 'prime cost' in civil construction
contracts?
Answer Posted / suneendra
Prime cost is a way of measuring the total cost of the production inputs needed to create a given output.
| Is This Answer Correct ? | 0 Yes | 1 No |
Post New Answer View All Answers
(Project Management Topic) What are the important criteria in the successful realization of the project?
hi, i am doing my B.tech third year and i want to have a job in Genpact...So can you help me which kind of job would be more appropriate for me in such a company and How should i prepare for an interview?
Dear sir, i want to NBCC & NTPC previous exam papers email Id : madhu_bingi@yahoo.co.in
How to calculate the force on a column of three story building. What should be the base concrete height?.
Please tell me vasthu room sizes. Thanks.
what is modular brick and it size
what do you know that m20,m25
What is reinforced concrete?
Specific gravity of cement?
What is semirigid connections?
What is the material consumption- cement,sand,tiles etc for Toilet dado?
How much material will consume for following specification water tank (9*7.5*6 feet)?
Doul Bar reinforcement and details of drawing.
what is meant by sustainable developement as far construction field is considered. Give suitable examples to explain the same
How to calculate concret slab? W l t(4mts*5*2fts) ratio m25 grade pls tell me procedure