What is the best mixture ratio in building a power plant?
what is the weight of a 1 sack cement?
what is the density of a cement?
Answer Posted / prakash
M25
50Kg
1440 kg per cubic metre
| Is This Answer Correct ? | 5 Yes | 1 No |
Post New Answer View All Answers
2. What are the advantages of your present job, things you like about it?
What is min thickness,min grade of conc & age of PQC ?
Types of column foundation and how to calculate its steel quantity.
Could you please give me an answer to the mixing proportion of concrete M1 grade (sterngth of 1 MPa)?
For submitting the project loan for bank Residential bldg,Suppose we take Provinding RCC mix 1:2:4 for footings No of footings,length ,Breadth,Height ,qty in cum, at last unit/Rate(Rs) ,i would like to know how do we get the unit/Rate
can any one give me sample question paper of BHEL at mdansari86@gmail.com as i m appearing for the same exam.
What is the purpose of the gap in the road on this bridge?
1) a)to prepare mortar for bricklaying how much amount of water should be added for its maximum strength and workability(to avoid cracks which results, when high quantity of water is added)?is their a formula or ratio? b) suppose we want to make 1:3 mortar,what is the best way to measure cement ,sand and water and how? c)time before which freshly prepared mortar should be used? d)proper way to mix and make mortar? e)when should curing start after laying bricks and for how long?and also how many hours per day? f)what is shear wall (please in terms of layman lol) bookish definisions are confusing.... g) and last,acc to codes what are max no. of course that should be laid in a day.
What is modular elasticity?
what is the service corridor?
Define absolute co-ordinates?
how many kg of 20mm, 10mm, dust available in one ton stone boulder
i am laying a base of dimensions 6.5feet by 7feet by 1.25 feet depth how many bags of 25kg cement and how many bags of 25kg sand will i need
Special thing in designing a overhead reservoir ? which is different from an ordinary design
why demand factor less then 1 ?