What is the percentage of wastage in steel reinforcement n how to control it?
Answer Posted / m.pagavan doss
5 percent
| Is This Answer Correct ? | 7 Yes | 2 No |
Post New Answer View All Answers
what is the use if we fixed butterfly ties in column and masonry work joint?....where we have to fix(distance)..
Please tell me the quantity of cement, sand, flyash, foaming agent required for 1 cubic meter of cellular lightweight concrete blocks. also , is there any admixtures required for the CLC blocks production.
what is pqc
1.How much batten required for 1 sqm Shuttering. 2.how much pipe & clamps required for staging of 100 sqm shuttering at 5.0 m height.
Tell me about triple point of water.
100mm block work 64 bags of cement used 150mm block work 286 bags of cement used 200mm block work 20 bags of cement used patly work (M15) 293 bags of cement used mortar ratio is 1:5 how to calculate volume of sand in cum & no. of bags
what are the types of dimensioning?
What is a projection line?
if a pipe those configuration (ASTM c 76 class b 450mm dia 2500mm length) fixing for water course those lining of water is 7000 running meter. my question is that if 8 joints of pipe ls leakage and we have not permission to stop the water so which treatment we apply on joint in that in condition.
how we check the thickness and line of ceiling plaster.
How can calculate the requirement of steel bars of rcc slab for 1100 sq ft?
Which is stronger solid steel rod or hollow steel pipe?
brickwork labour rate per cum ?
HOW MANY BAGS OF CEMEMT USED IN PER M2 OF PARTITION WALL
trapozidal