How do you measure the centring work
Answer Posted / prajna paramita pradhan
squqre feet or meter square
| Is This Answer Correct ? | 39 Yes | 3 No |
Post New Answer View All Answers
My daily concrete volume of M25 concrete is 1st day= 25 Cum 2nd Day = 45 Cum 3rd Day = 55 Cum 4th Day = 22 Cum 5th Day =72 Cum 7th Day = 49 Cum. What will be acceptance criteria of concrete considering as per is 456 cl.15 and table 11 (cl 16.1 and 16.3).
Which is the most prominent tower of world?
What out turn civil works
How to activate isometric axes in cad?
Q 1) 1 Mason and 2 LABOUR / _________CUM brick work Q 2) 1 Mason and 1 LABOUR / _________SQ FT Plaster work Q 3) 1 Carpenter & 2 Labour/_________SQ FT shuttering work Q 4) 100 SQ FT roof slab concreting ____________mason and labour required
how to calculate total cost for slab 35'×8'
how to calculate the steel in 500yard
cud any one send me tech quest paper(civil engg) at tarizus@yahoo.com
How to make tiles floor step by step procedure?
In an aggregate blending plant, water is sprayed before blending is performed. If the fine content in aggregate is as high as 25 %, will not the fines form into lumps / balls and distribution will not be uniform ? Further, the fines will stick onto the interior of pug mill and its content will be low. The mixed material is stockpiled for weeks / months before use. Will it not be better that blending is done in dry condition, and water will be added only during compaction at site. Please forward your comments and suggestions.
Define Workability ?
What is braced excavation all about?
what is features of a typ-ical modern air-conditioning installation?
what is the use of beam end forces while using a staad ? wha they are show
how much brick, cement, and sand required in 1mtr X 0.23mtr X 1mtr brickwork(1:4), 230mm thick wall and 10mm thick mortar , brick size 230mm X 70mm X 110mm