How does milli volt is created in themocouple?
Answer Posted / nandu
T/c has to junctions
1.hot 2.cold
depending upon the
difference b/w two
junctions the mV can
be measured becoz of
T/c material its a alloy
| Is This Answer Correct ? | 0 Yes | 0 No |
Post New Answer View All Answers
what is the diffrence between pressure safety valve & pressure relief valve....pls
Yokogawa CENTUMVP R6.09 unable to download to Engineering Station with ExaOPC R3.75
The issue is when I try to download the common project section to the Engineering Station (STN) from the HIS in System View, it is unable to connect. The error displayed is:
WARNING: Could not connect to equalize destination. (7001)
Retrying. Number of retries = 0/1
ERROR: LdXopsLoadMain: connect error 10060
ERROR: Processing terminated due to connection error. (7002)
Equalization end with errors. STN0149
---- ERROR = 2 WARNING = 1 ----
Background:
>Updated the ExaOPC software on the STN from 3.60 to 3.75
>STN operating system is Windows Server 2008 R2
>HIS operating system is Windows Server 2016 Stanard
Solutions attempted include:
>Ensuring all IP addresses are correct and all networked devices can be pinged.
>The ability to ping a device using its host name from another device (
Give an example where you had aproblem on the job, and tell me how you solved the problem. and the finalvoutcome.
If we increase only P what will be controller action ?
why we use the ac supply load cell>?can we use the dc supply load cell?advantages and disadvantage of the ac supply load cell?
principle of automatic votage regulator
Valve positioner and actuators in detail.
How to find out the current of two motors having same power consumption but different RPM?
Q-Explain the different load conditions that will produced different offset which may or may not be acceptable to thhe control function
How to calibrate the flow transmitter
what is the protection system in solar turbine compressor
what is the calibration procedure for transweigh make weigh feeder?
who's take first position in process in the timing of new installation flow transmitter and control vavle. give the answer with logical trick.
full process of gas turbin?
What are continuances of connecting earthing and shield of branch cables (instrument to Junction box), at the same earthing pot provided on JB? Is it ok, or may produce some problem?