What is the proportioning by weight of 1:2:3 concrete mix
design of cement, sand, gravel, and water in metric for a 3000
PSI concrete strength and a target slump of 75-100mm?
Answer Posted / awadhoot
3000 PSI concrete strength equals to 20 N/Sqmm.
characteristic compressive strength of concrete.
Now refer to Table 9 "Proposrtions for Nominal mix
concrete", on Page no. 23 of IS 456:2000.
Here, for M20 grade concrete, the total quantity of dry
aggregates by mass per 50 Kg of cement is given as 250 Kg.
Considering proportion of fine to coarse aggregates as 1:2,
Fine Aggregates can be calculated as 83 Kg. Say 100 Kg, then
coarse aggregates will be 150 Kg.
Quantity of water per 50 kg bag of cement can be allowed up
to 30 litre to the Max. However, target slump of 75-100mm
can be achieved by following trial and error method.
Hence, for 1:2:3 proportion of concrete,
Cement:Fine Aggregates:Coarse Aggregates
50Kg : 100Kg. : 150Kg.
Here Fine Aggregates = sand and
Coarse Aggregates= gravel
| Is This Answer Correct ? | 6 Yes | 1 No |
Post New Answer View All Answers
What is the difference between chamfer and fillet?
CAN WORK WELL UNDER DEAD LINES OR PRESSURE?
what is work of planning deptt. in any construction compny (in road project)
is there any influence of water(used for mixing of concrete) on a weight of harndend concrete.
How many square meter can mason layout chb per hour
WHAT IS THE CAUSES OF RUTTING ON FLEXIBLE PAVEMENT?
How much cement,sand,bricks and water needed for 1square metre brick work?
what values & beliefs have guided you in your career path
Can inverted beams used in pipes during construction? If yes, explain how it can be implemented?
can i make bricks using M10 grade concrete ? and what would be the cost of a brick if we use m10 grade concrete sand and aggregates ??
What are the advantages of cad software’s?
what is the anchorage length of reinforcement.
how to find quantity of concrete in PCC M15
"how can we find the approximate quantity of materials using in a building or total Expenditure in percentage for rough estimate after known the construction area(sqm)".please if you know something about that please post the answer.
What is horizon or horizontal mining?