What is the role and reponsibilities of Electrical
Engineers in construction field?

Answer Posted / mariappan

• Study of drawing and execute the work
• To co-ordinate with Electrical Contractor for Electrification, Execution, Erection & Commissioning.
• To provide the entire electrical solutions as per requirement.
• Design for illumination of different area and lux calculation.
• To check the entire work as according to approved drawings.
• Handling of electrical load as per requirement.
• Cable size calculation cable scheduling &its route selection ,over head or under ground.
• Review Inspection and Test Plans in order to perform all required inspections and witnessing all required tests and add witness and hold points for the Client’s Inspection.
• Review inspection reports and records of Quality Control carried out on completed and running Project activities.
• Review Client’s Inspectors deliverables, analyse and resolve issues and problems emerging during the Quality Control activities. Ensure that all inspection and tests witnessed by clients
• Drawing submission and get Approval from consultants
• Site issues highlighting and send to consultant
• Site Additional work Prepairation and send the Quotation
• Check and Plan the EOT Date & schedule of the Project
• Every two week once attend the site technical coordination meeting
• Monthly once attend the site safety coordination meeting
• Detail engineering with safety factor in the design.
• Updating the Drawing depends on site condition
• Mock up unit Prepairation and execution
• Checking the Workmanship and material Quality as per approved make and standard work for the Right quality and standard work
• Daily & Weekly work Progress Report Prepairation and Keep the Record
• Preparing the Monthly work Progress Report for Claim with Measurements
• Monthly LEW Tools inspection check list Prepairation and checking
• Daily I conduct and maintain the tools box meeting and checking the Height work Permit (above 2m)
• Preparation of Project Report for correct and Timely information for the Progress of work
• Responsible to do surveys including site measurements
• Responsible for Highlighting foreseen Problem & Delays in advance Escalating to the PM
• Client communication and correspondence
• Quality Assurance
• Coordination with workers
• Manpower Controlling and solve the Problem
• Updating of material stock
• Weekly Material Requirement to be send by email to office
• Final Documentation & Billing Works

Is This Answer Correct ?    58 Yes 6 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

What is the dc grounding system and what is diff between AC/DC grounding system?

1632


what is protection class current transformer.

3434


is it possible for different brand of H.V transformers to run or operate in parallel to each other? if so how much disturbance can this affact the H.V bus bar?

1649


What is the RMS and DFT principle of analogue maesurments. Which way they are advangages. where which princples give optimum results.

2176


Use of switch mode power converter in real-time basis?

636






what is the significance of terminal voltage and phase sequence in the operation of paralleling of two generators?

2028


how mass curve differs from hydrograph.

1300


What is pole of the system?

678


What is the maximum percentage voltage drop (vd%)for a motor control center

1553


Why we use mho Relay in long transmission line?

959


Is it advantages of having star-delta vfd than normal star vfd , if yes why?

1776


How does the slip regulator works as a startor

1505


What is cable tray, its type, and its support?

673


how to test the turn ratio of 3 phase transformer using volt meter shoe the curcit diagram.

1845


please send me jindal previous aptitude and technical question and answer.my email id is deep_raj@live.com

1503