Answer Posted / bhaskararao .n
Hydro power
plant has less
maitance cost
because water
availble at
free of
cost,less
labour cost
becaus few
numbers
required for
checking of
operation,no
fuel
transoproting
cost .
| Is This Answer Correct ? | 0 Yes | 0 No |
Post New Answer View All Answers
What are the main parts of central chiller plant? Explain the function of each stage.
Explain the experiment on ward leonard method of a speed control on a dc shunt motor with an suitable circuit diagram.
What is primary and backup protection?
What are IR values and what it should be for coil and for insulator
What Is HO factor in power selection
Write masons gain formula.
Difference between megger test equipment and contact resistance meter test instruments?
How to calculate MCB Breaking capacity.
WHY IL=IPH IN STAR AND WHY IPH=IL/1.732 IN DELTA? WHAT IS REASON BEHIND IT?
What is an alternator impedance value?
How can we find out LT UG cable fault (size,from-4*25mm sqr to 4*300mm sqr)? How mani types UG cable faults?
Briefly define and explain the following different types of Pulse Amplitude Modulation (PAM) with some examples. i) 2-PAM ii) 4-PAM iii) 8-PAM iv) 16-PAM v) Quadrature Amplitude Modulation (QAM)
What is phase cross over frequency?
we need a ntpc previous papers
What happens if we connect a single phase energy meter in reverse polarity.