Answer Posted / ibrahim b. cayaba
NCR is being raised when a deviation or a major non-
compliance from the Specification Requirements or sety
Standards were observed during the process of inspection,
an NCR requires a "CAPA" to close it.
| Is This Answer Correct ? | 1 Yes | 0 No |
Post New Answer View All Answers
Give notes on role of ISO in quality assurance.
Can anyone pls tell me how to do action parameterization (input and output parameters) with respect to login window and insert order of flight reservation window in detail( pls give a clear step by step explanation with example) anyone please
How are the quality assurance activities planned ?
What is verification?
What is backus-naur form?
What is basis path testing?
How do you differentiate between priority and severity of the defect within the project?
What is the difference between compatibility testing and cross browser testing?
how cani do requirement testing using some testcase
can you provide negative scenarios for ios alarm clock
What is cross browser testing?
When do you think qa activities should start?
Tell me some key points to consider while writing a bug report.
List out the roles of quality assurance engineer?
Can you build a good audit trail using Compuware's QACenter products. Explain why.