Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

What is the mix proportion of m30 grade?

Answer Posted / arunkumar

M30 GRADE OF CONCRETE DESIGN MIX .PROJCT CONSULTANTS REFER RATIO 1:1:2

Is This Answer Correct ?    2 Yes 2 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

What is the difference between the concrete mix design carried out by IS10262 and by ACI method ?

2782


Explain creep?

1168


I am a civil engineer . I am also selected for sbi clerk interview which is to be held on 4th May2010 is there anybody resembling the same? what question can be asked and what should be the probable answers?

2479


acceptance criteria for concrete works

2247


sir, whitch is the best book (writer name) for prepration of gate....

1715


How much river sand contain the 6 & 10 wheeler truck? Or Maximum sand that any type of truck carry?

5034


do we consider shrinkage factor for calculating cement consumption for CM mixes for different works?

1790


what are RIB slabs explain about it

2685


rate analysis hiring of generator 62.5 KVA

2288


Draw the cross section of a boundary wall and label its part with detailing?

4682


Is it possible to make a feature using an overdefined sketch?

1437


how many litres of enamel paint required for 5000 sft of site?? 

1991


whats is difference between anchorage length and development length

1930


What is the difference between one-way slab and two-way slab?

1399


In foundation design, while we do the base pressure check, we normally check if the attained pressure value is less than the GROSS BEARING CAPACITY of the soil which is the sum of net bearing capacity of soil and the overburden pressure. Actually, the overburden pressure acts against the net bearing capacity of the soil and I feel that we are actually increasing the bearing capacity value and doing the check. I feel that this is NOT right. Please clarify on this.

2328