Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

why seal air fan is used and where it is used and where is
suction taken from

Answer Posted / sita sharan shah

seal air fan is used for saaling mills&fan.PA fan discharge
its suction

Is This Answer Correct ?    7 Yes 3 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

Looking for Bently Nevada surplus 3300/52-01-00-00 Reverse Rotation Monitor , 4 pieces.

3421


what is the difference between compensated & normal drum level in boiler drum?

1820


why airtel use + 24 volts and other operators use -48 volt

2643


what is restricted earth fault explain in details

2065


what's the moog valve

1521


can u please tell me how to calculate the concrete quantity for a under reamed pile? r=300mm,depth=3m for a cylinder and for bulb l=.750mm,width=.525

1760


What is difference between secondary Air & Tertiary Air and Their use.?

2017


How to calculate boiler capacity? I have 1 Autoclave, Which has to use for AAC block. Dimension for this Autoclave is - 13 Meter Length & 2.2 Meter Diameter.

2305


what is the meaning of SST300 V56A in SIEMENS turbine

4373


Qatar Fertiliser Company (QAFCO) Shortlisted me for interview (got the intel from my source) for Field Operator- Utilities post. Please let me know what kind of questions they asked? ... this position requires 5 years of experience in Power Plant and background Diploma in Electrical/ Mech. ... my Background is Electrical and I am a sub Assistant Engineer (Operation) at a private HFO based Power plant... PS: Please Let me know what preparation should I take to obtain the Interview which will be take place In Bangladesh soon

2507


explain how the third harmonic content of the magnetising current affects transformer design

3303


dear sir i have completed one year post diploma certificate in thermal power engineering from national power training institute durgapur ...plz suggest me for power sector job

2563


DCS marshaling Cabinet Power supply can be replace during plant running time? Answer Yes it is possible. I am talking about the controller and cards power supply modules. They are always redundant and connected through diode so that if one power supply fails the other can take the charge immediately.so it is possible to replace one of them in running plant if the other one is healthy. MY question is how switching done.

1018


why is the in steam turbine axial displacement of active side thrust pad is positive and non active side thrust pad is negative.

3272


What is surging in a centrifugal compressor ? How it occur's ? How is antisurging done ?

2450