Answer Posted / rajesh d karde
vertical member supporting is call shuttering and horizontal
member supporting call centering
| Is This Answer Correct ? | 1 Yes | 2 No |
Post New Answer View All Answers
What are the delays in construction projects due to approvals from owners? How can we analyze them in different prospective? Whats their affects and effects on presently going work?
Spider cracks occur in beam bottom due to––
percentage of metal,clay or soil & water in water bond macadam roads to know the quantities for each in total volume of 11500 cubic meters
writte a c prog. to acept 5 no. from consule and then display them back on consulte in ascending order
Pile height is 4.3m. 2nos. under reammer. bulb nose is 75mm and height is 400mm. pile dia is 375mm and overall dia 940mm.pls. help to calculate concrete in pile and bulbs separately. What is formula for bulb volume calculation ?
Can we apply curing compound on ceiling (slab Bottom)
suppose we have a tendency to make a hole on the surface of the simple supported beam, than where we goes to make it?
How does siphoning work?
difference between trapezoidal and pedestal footing and how the load acts on that
what is called Bulk Density of aggregate?
For what building Built-on balconies are preferable? What are the advantages?
what is the water cement ratio for plastering
yasser arfatcompleted his degree in civil from which university
What is the zero value in quantity surveying
what are RIB slabs explain about it