Answer Posted / sailesh
Chair Is provided in slab as to maintain the height between the top reinforcemnt and bottom reinforcement , so as to get correct front for cover .
| Is This Answer Correct ? | 22 Yes | 1 No |
Post New Answer View All Answers
how to find out hard strata in bored pile when the DMC method adopted.
how much deduction will be in 32 mm dia HYSD steel bar for 45 and 90 degree bend
what is meant by sustainable developement as far construction field is considered. Give suitable examples to explain the same
Time required for curing of wall tiles before fixing
please give me the rates of RCC(CUM), PCC(CUM), Brick Work(CUM), Tile Flooring, Saria Shuttering
How to calculate quanty of steel in four leg stirrups?
What is difference between code and standard and specification?
How do You Maintain a structure after getting cube test of low strength.
Which is the latest version of solidsworks?
In how many types u can do POP on ceiling and walls(on which material or by using which material)? b) what is the difference between dry , oil bound, enamel, acrlyic type of painting?
What does civil status mean?
how to calculate the rebar depth if forgot the foundation reinforcement (main steel)? is that any calculation or formula we have data sheet of supplier what depth what is the pull out capacity is mensioned in data sheet. if any IS code than its help full to me.
How many litres of water used for curing of 1000sqft of slav
While calculating the weight of the steel per running meter, the formula used is [(dxd)/162]. Why 162 is used in denominator & how it is derived?
i just want to know how much require sand and cement for 1 sq.mt including wastage. Please guide me as soon as possible.