how we can calaculate cutting lengh for stiruups 6mm dia .
column size 20 cm x 30 cm, cover 20mm
Answer Posted / chinnasamy
20CM X 30CM
200MM X 300MM
DEDECT COVER
200-20-20=160MM
300-20-20=260MM
HOOK LENGTH=10D
HOOK LENGTH=10X6
=60MM
DEDECT ELOCTION=2DX5CORNER
=2X6X5
=60MM
CUTTING LENGTH=(160+160+260+260)+60-60
=840MM
| Is This Answer Correct ? | 3 Yes | 5 No |
Post New Answer View All Answers
how to nfind out the specific gravity of sand.aggregate,water please help...
What is the amount of work done by a carpenter, bar Bender and plaster Mason in interior and exterior plaster
How can we demolish concrete beams?
Please design 12.5m long dubbly beam
what is the proper procedure in conducting a california bearing ratio penetration test on soil on cbr machine?
i am laying a base of dimensions 6.5feet by 7feet by 1.25 feet depth how many bags of 25kg cement and how many bags of 25kg sand will i need
in staad pro. modelling for a parallel scissors chord truss, when i assigned roller support i.e fixwd but with all Fx, FZ, Mx, My and Mz release except Fy... the analysis results " in stability at a joint, with direction Mx or My..what could be the reason...anyone please explaing
What is the number of IS code of practice to be followed for hydraulic design of sewerage pipe line?
The building has 12 columns of 12x9 in 3 rows of 4 each in a plot of 50'x30', The central row is strengthened with 16mm twisted rods. The roof area is 1500 sft including balconies. calculate the load factor per sft. Also indicate the number of roofs the building can withstand.
What are the skills required to become an architect?
from one meter cube of stone masonry structure how much cubic meter of cement mortar we use as our estimation 25-30% is that correct for estimation of quantity of sand and cement(2:1) proportion of mortar
Can inverted beams used in pipes during construction?
Difference between lime, distemper and plastic emulsion?
pls tell estimate for 1 kilometre length random rubble masonry 0.90 metre height 0.600 metre width
Pile height is 4.3m. 2nos. under reammer. bulb nose is 75mm and height is 400mm. pile dia is 375mm and overall dia 940mm.pls. help to calculate concrete in pile and bulbs separately. What is formula for bulb volume calculation ?