What is OLTC in a transformer, specify its fuction.
Answer Posted / raj lahare
Dear Dnyaneshwar, Please mote that 1)In HV transformers the LV winding is nearer to core and the HV winding is away from Core There fore it is easy for taking the taps .2) The current in HV being lower the switching current in OLTC is low.
Please note. 3)The RTCC means the Remote Tap Change Control Cubical This is installed in Control Room so that the Taps of the Transformer which is installed in Switch Yard can be changed from the Control room only. 4)The RTCC if provided with AVRCR then the taps are changed automatically by sensing the LV voltage. The AVRCR means AUTOMATIC VOLTAGE CORRECTION RELAY. 5) In bigger transformers say Voltage class 220 KV and above the OLTC tap connections are provided on LV side due to the insulation levels of high voltages at the switch.
Is This Answer Correct ? | 0 Yes | 1 No |
Post New Answer View All Answers
I am going to appear RRB Sr. Section Engineer Exam, Electrical. Can you send me previous year questions of RRB Electrical engineer. specially Section Engineer questions. my email id is likerahulworld@gmail.com
How to calculate the no of Ceiling fan (1200mm sweep) per unit area?
How many points does a Circuit can have?
1)What is a Triode? What are its uses? 2) What is a Triac? 3) What is a Thyristor?
In india, according to trade theory above 5 HP motor reqired star delta starter. But we R connect 11 KV motor with 14MW in Direct to line ( With VCB starter combination) Can U Guess, How it is possible ?????
can anyone send me some sample question regarding power grid corp
In Plumbing services What are accessories we consider for a bathroom?
What is the difference in calculating size of AC cables compared to calculating size of DC Cables? Usually DC Cables are larger than AC Cables although they have the same ampacity. Why is it?
how braking & making capacity of circuit breaker is calculated?
State thevenin’s theorem?
How to synchoronize the generator (with gcb,GT) to grid????? ????? from Grid iam getting power (rated 400kv/20kv) through GT and its goes to UAT.,,ST.,, now my generator(rated 20kv ) ready.,, now iam closing my GCB.,, in GT iam suddenly giving 20kv on that Gt.,, what will happend
If we need 4c× 50mm sq cable but it's not available so we can pull 4c×25mm sq two cables?
Can anyone please provide me details of MCCB/Contactor/SFU rating calculations for a motor feeder..for example 50 kw.. not from type-2 cordination chart. i want manual calculations..
When color of silica gel will gets change from blue to pink from Top to bottom?
What is earth system using on the floater TN-S or TT. Iam not sure and what ICCP