what we execute firstly wall tile or floor tile?
Answer Posted / sachin
We firstly check FFL thiyyas of both flats or rooms and check right angle of room which we laid tiles, slab cleanses work, electrical pipe under the tiles mortar.
| Is This Answer Correct ? | 0 Yes | 0 No |
Post New Answer View All Answers
What is the ideal size of the living room ranges from small to large size?
what would be the design load of R.C.C Cooling tower per cell.?
In the design of bridge arguments what considerations should be made to select the orientation of the wing walls?
What you understand by building codes?
What tor stands for in tor steel?
PCC Road Min Grade M 30 for VR standard Mahatashtra load 30 KN. what should be thickness of pavement, width 4m what should be length of panel.
can you provide a link for manual design of building?
Can anybody help by describing each and every step in short, used while giving a building layout by total station? Regards
What is aggregate?
What is meaning of Canceled/Flat Beam. What is difference between them? Both type of beam can bear same load if size (width)of the flat beam is increases and depth is same as slab thickness? Kindly suggest to me.
Specific gravity of cement?
Which purpose we use deck anchor in bridges?
How do you prepare Material Recovery Statement for deduction from contractors bills?
For submitting the project loan for bank Residential bldg,Suppose we take Provinding RCC mix 1:2:4 for footings No of footings,length ,Breadth,Height ,qty in cum, at last unit/Rate(Rs) ,i would like to know how do we get the unit/Rate
If a slab concrete is placed with M-20 grade concrete, actually it has to be placed with M-30. what are the rectifications / measures to be taken after concreting is done.