Answer Posted / mohammed abdul muqtadar
Between 2.2 to 2.4 Ton/M3
| Is This Answer Correct ? | 1 Yes | 0 No |
Post New Answer View All Answers
60-70 grade of Bitumen is VG-30 ?
in a building why we are using T beams? why can i adopt beam bottom & Top level as same as slab bottom & Top level?
WHAT IS THE % OF CONCRETE WASTAGES PERMITED IN A LARGE PROJECT ? AND WHICH IS CODE TO BE REFERED.
How do you compute the volume of airflow?
What is the purpose of Chipping in the heavy foundation?
what is the weight of 12mm aggregates?
What are the composition of a landfill?
how to calculate the length diamond shaped striupps in column
I have completed building maintenance course in mcvc stream .. can I apply for the post of " sthapstya abhiyantriki sahayyak"?
Why do you want to work here
Explain the benefits of using standard terminology in the measurement process?(Tendering and estimation)
What is dead load impact load live load
Explain the various stages of the project planning process in construction?
What is thumb rule in quality and quantity estimation of a Residential building??
What happens when,in Prestressed girder the HDPE duct and cone size is provided more than required? (technical answer expected)