Answer Posted / naresh babu
for example M15 = 1:2:4
volume of wet cement concrete =1.54 to1.57m^3
so cement =1/1.57=0.63
sand= 2/1.57=1.27
concrete =4/1.57=2.54
| Is This Answer Correct ? | 2 Yes | 21 No |
Post New Answer View All Answers
how much repeitation for conventional and maivan formwork?
How to find out kg per Sft ?
Explain what are the phases inspections are done by local authority while construction?
Explain what is Hybrid Foundation?
How to calculate sand , cement quantity for 23mm thk brick work(10x10)
We are into industrial flooring (epoxy flooring) business. We buy material from manufacturers.We supply and laying the to companies. In our billing what tax/ taxes to be claimed from companies? Are we applicable for only WCT or any else?
cement required for construction of 400mm*200mm*200mm concrete solid blocks for 1sq.mtrs,how?
for 16mm thick cement plastring 1:6 on 100 Sq.m.New brick work,the quantity of cement required is.
what is the tensile strength of 10swg and 8swg gabion wire?
if in column reinforcement lower dia connect to higher dia then from wher we want to start higher dia steel
What is portland cement
B.M DIAGRAMS & S.F DIAGRAMS OF CONTINOUS BEAMS
what is the calculation of raw material for 0.35cum of m-15
rcc floor to floor 4m. in column reinforcement where we provide lap in exact location.
What is the use of water table & Kreb stone for drain