Answer Posted / sheikh
firstly you should know that what is rated current of
50kw.motor and relay can be adjusted twice of rated current.
| Is This Answer Correct ? | 0 Yes | 0 No |
Post New Answer View All Answers
Why does amplifier gain reduce?
why need to be maintain power factor for industrial customer?
Why we used 690V in ACS 800 drives.Why dont use standard voltage like 415v or 1.1Kv
Difference between HRG and NGR. Are they both the same thing
how power is generated,and transmitted to our home..pls explain briefly in simple words.
A 15 kw squirrel cage motor having a maximum efficiency of 90% on a continuous full load has temperature rise of 42 degrees celcius after 30 min and 52 degrees celcius after 1 hr under the above operation conditions. a) calculate its final steady state temperature rise on continuous load and the heating time constatnt. b) if the motor is operated on a short load for 9 min estimate its temperature rise. c) calculate the maximum overload that can be applied on a short, 9 min rating so that the temperature rise is the same as the final steady state temperature rise on continuous load.
A 100W electric lamp is supplied from a 115V, 60HZ source. The peak instantaneous power dissipated in the lamp filament is
on a three-winding transformer relationship delta-delta-star, on third winding why the relationship is a star? what are the advantages and disadvantages? Thank you and please help
what is distribution board?
Why the efficiency of generator is more than motor in swinburne's test
What determines the thickness of the lamination or stamping?
There are Two questions about Steam Turbine Generator... What is HRSG bypass of LP, HP used for in power generation? In particualar, in the event that fault of HP bypass, there would be STG TRIP in operation but none on the LP bypass fault...what's the reason ?
Dear friends, i would like to know that what is the exact function of 'exciter winding' & 'aux winding' in Alternator?
A 7 storey building has a floor area of 35,000sq.ft on each storey. On the ground floor 11KV electrical sub-station is to be erected. A load of 3kw for every 400sq.ft (p.f is 0.8) is proposed for each floor. fire pump 7.5hp, water pump 5hp, lift 2 nos, each 10hp and 20shop load of each shop is 5kw. calculate a. load each floor b. total load of building c. L.T feeders for aech floor and from transformer to main. d. distribution diagram e. capacity of sub-station/capacitor bank f. line diagram
What should be the values of settling time, peak time, steady state error, overshoot, rise time, MPOS (Maximum percent over shoot) to keep the system in transient state, to keep the system in steady state ?