Answer Posted / arvind rai
FORMWORK MEANS SIMPLY SHUTTERING WORK
| Is This Answer Correct ? | 1 Yes | 0 No |
Post New Answer View All Answers
contractor receive 100 MT steel.after compliting the work the contractor refund 90 MT steel.How reconsilation of steel done?
Design a cantilever type retaining wall to retain sand for 4m above the ground. The sand fall slopes at the rate of 1 vertical to 2 horizontal. The weight of sand is 18000 N/m3, the angle of repose being 30. The safe bearing capacity of the soil is 200 kn/m2 at 1/25m below the ground level. Use m 15 concrete mix.
Normally in slabs, steel quantity is not added when you calculating concrete quantity for that slab, why it is not added ?
what pressure the NP2 class RCC pipe can sustain?
Define angular dimension?
How to find coloumn vertical cut length floor to floor & lap + bend or anything plz clearfiy
how to balance aggregate during mix design of concrete???? how to calculate moisture content like C/A,F/A and how many percentage using ice instead of water for example of we are preparing ice concrete??????
What quantity of 1.0 m3 bricks required?
I need to constructive work in amaraj batteries
Explain major difference between auto level and dumpy level?
what is total volume of ingredients used in concrete accordingly
Mention different types of roof systems?
why should we use 20mm graded metal only in vrcc?why we shouldnot use 40mm metal?
how do you calculate the length of "L" of main & distribution bar for reinforcing of raft footing
What is packing Factor ?