Give list of building construction equipment & explain about
them in brief.
How much is fuel consumption of JCB, DUMPER, POCLAIN, TRANSIT
MIXER?
Answer Posted / arvind rai
Fuel consumption of Construction machinery
JCB : 5 LTR / HOUR = FOR EXCAVATION AND DOGGING
DUMPER : 1 LTR / 2KM= FOR UNLOADING DEBRIS AND SHIFTING CONS MATERIAL.
POCLAIN : 12-14 LTR /HOUR : MAINLY EXCAVATION & BREAKING ROCK , LOADING MATERIAL
TRANSIT MIXER (MILLER) = 2LTR/KM = TRANSPORTATION FOR CONCRETE
| Is This Answer Correct ? | 10 Yes | 4 No |
Post New Answer View All Answers
Explain why concrete barriers have curved surface profiles?
What are the composition of a landfill?
How do you change a dimension value in solidsworks?
if a pipe those configuration (ASTM c 76 class b 450mm dia 2500mm length) fixing for water course those lining of water is 7000 running meter. my question is that if 8 joints of pipe ls leakage and we have not permission to stop the water so which treatment we apply on joint in that in condition.
if i used salt as a add mixture in concrete, then what will happen and what are the naturally available add mixtures.
Find out Cutting Length of Steel for Right angle Triangle? Where Opposite Side 4m, Adjacent side 6m. (Assume cover 40mm)
Laying bitumen concrete 40mm thick using 0.1372 cum of 13.2 10mm metal ,0.2387 cum of 10 5mm metal...what did it means please explain me how much cum of 10 mm metal need?
How to calculate carrying capacity of the existing water supply trunkmain
What are the applications of cad?
How to arrive the co- efficient of all civil activities? For ex:- painting-enamel in wooden doors. co efficient is 1.8. How this is calculated
What is specific gravity???
Plasterers do how many sqm with spray plaster machine? By hand one mason does 10m2/day. How much they do in Dubai with spray plaster machines?
How to use of me trial wall plaster 6mm , 10mm par sqm. use in sand and cement ?
what do you understand by M25 concrete
I have certain queries, please help to solve. a) length of pile bore is 4m.excavation quantity will be area * length where area will be pi/4 * dia*dia. Is this right? b) It is a single reamed pile of 300m dia and reamed dia is 750mm. can any body help me to calculate excavated quantity of this bulb(reamed section),, concrete quantity in bulb with showing the formulas to be used?