How can get electrical "c" licence.I am complited in
Deee.Passing year of 1993.Working in pvt cocern lt
Line.Please advise me .Cell no 9994786021
Answer Posted / sakthi prakash
Iam completed DEEE. Also now doing BE. iam connot experience
person. then how i got c-license?
| Is This Answer Correct ? | 80 Yes | 34 No |
Post New Answer View All Answers
If I have 3 essential main switch board and 3 incoming electricity ,but only 1 genset running is that possible.
what is deffrence between squirral cage and wound rotor in IM?
Thumb rule of cable size(rm>30 rm)X multiplying factor=ampere
What is called grain-oriented laminations?
why is control bus bi-directional?
When lag/lead/lag-lead compensation is employed?
what are the usual topology of transformers at different substations in the power system and why that particular topology is choosen. what are the limitaions of that topology?
What is systematic error?
As per the Anchor capstan motor specification, full load current is 200A. starting current is 1750 A and acceleration time is less than 8 seconds. Please guide for selection of cable size.
how to put cable sizing and cable glands size for respective cable & Cable Lug size in a DB sectors???
How much voltage we need to apply in 33kv cable during hipot test of cable
How can i calculate the Breaking capacity of molded case circuit breaker, is the breaking capacity of CB for Diesel generator shall be less than grid supply's breaker ?
Why do you have to use Protecion relay with the function MTB ( Mechanical Trip Button ) for electrical system.
According to IEC60034-14, When the vibration monitoring system required for motor Bearing. above which KW, it is required? and for what type of bearing the vibration probe is provided.
A mass of 1200g is accelerated at 200 cm/s2by a force. The value of the force required is:(a) 2.4N(b) 2400N(c) 240 kN(d) 0.24N