in a centrifugal pump .. when we close the delivery valve
partially .. does this increase the pressure before or after
the valve .. and why ??
Answer Posted / sunil mac
th current of the pump will increase because of back pressure then it will be tripped from the over load relay...
Is This Answer Correct ? | 0 Yes | 2 No |
Post New Answer View All Answers
Draw L.O. system in diesel engine?
How to find ground in main switchboard?
Which is the hardest material on earth?
What is the formula for heat loss in a pipe?
What are your specific job requirements in mechanical engineers?
Is there significant affect on the output of modern gas turbines due to low frequency.
distinguish the knock phenomena of ci and si engine?
What is the formula for 1 HP of a two-cycle engine?
Explain the principle of Suizer Fuel oil injection pump
What is the impulse reaction turbine?
What are the causes if one cylinder in a diesel engine has a high temperature?
Tell me on steel
Name the operation which can be performed by lathe machine?
Dear all, Will some one help me in this issue please? We are entering the Zero Stock Component in Maintenance Order, and we make a Check when the order creator is going to release system will appear Error, until he will not delete that zero stock components from the Maintenance order. but right now what the order creator is not releasing the order but he is going to save order, when's he save the order without release system will generate Reservation in the back ground, which should not happen for Zero Stock Components ? I need the way which we are doing in MB21, Reservation creation by thru Cost Center / WBS Element. At present if you run MB21 and you are going to issue the material system will not allow to generate the reservation if there are zero stock components in the list. please guide me for this issue ? Note : Simple what I need is I don't want to create any reservation thru maintenance order for the Zero Stock Components. Regards, Abdul Mujeeb
How to find DG efficiency and unit per litre