Answer Posted / chinnasamy
1m3=3.28*3.28*3.28
1m3=35.287
Cum*cft
1*35.28
| Is This Answer Correct ? | 1 Yes | 0 No |
Post New Answer View All Answers
Moisture content calculation for diff mix ratio's ??
quantity of material needed for rubble stone masonry for 1:4 and 1:6
Can anyone suggest how to determine scheduling of reinforcement of floor beams from Staad model,other than clicking each beam respectively 7 noting down the values ?
What are the reasons for geotechnical site investigations in uganda?
If 40 backlogs are cleared m finally with 65 percent marks . Am I eligible to get visa to US
cement required for construction of 400mm*200mm*200mm concrete solid blocks for 1sq.mtrs,how?
What is a tensile strength? What is the tensile strength of wood?
What is soil enforcement?
Tell me about triple point of water.
why do we not deduct volume of steel to find actual volume of concrete in practical???
how many type of admixtures for water stored structure?
for 16mm thick cement plastring 1:6 on 100 Sq.m.New brick work,the quantity of cement required is.
Please send me the qunty. of mason/labour required in each day for different type of civil construction work?please send me ans. in my mail.my mail id is (parthamitra086@gmail.com) or here.
Explain what is alternate bid?
How much time Required for PPR pipe network testing