Answer Posted / rama
TMT rod means thermo mechanically treated rod. thease rods
has high strengh. because thease are allready treated as
thermally so it cant affect more by thermal or heat compared
to other rods.
it is also not affect by mechanically... because intially
the rod is heated then hit by hammer to get the suitable
size. so TMT ROD IS USED AS BARS IN CONSTRUTION FIELD.
| Is This Answer Correct ? | 7 Yes | 0 No |
Post New Answer View All Answers
PCC Road Min Grade M 30 for VR standard Mahatashtra load 30 KN. what should be thickness of pavement, width 4m what should be length of panel.
What is the use of extend command?
How much for the BRC lapping in full yield and half yield < and which table to get it ?
Actually i am confused that how to calculate the bending moment for a semi-circular beam and curved slab.If any one have a good idea about the matter,please give the answer with a suitable example. Thank you......
What will you do if a portion of load bearing wall collapses under your supervision?
I want to know the relevant IS codes of practice which deals with different testings of cement-sand mortar (nominal mix)that is being normally used for brick work or plaster work in the construction work.
Define What is the origin of name Railway Sleepers?
How to calculate or what is the process of calculation for making 1Metre squre area by AAC Blok which quantity of Cement, Sand & Chips are to be required?
sir tell me the formula for calculating the volume of 380mm dia double under reamed pile of 4.0 mts depth.
what is derating factor in cable? what does it mean if derating factor is high/low in terms of thermal resistivity of soil?
why & what is perchatage we are using fly ash in concrete?
what are the strength theories for yeilding and fracture materials. state the theory more suited for 1. mild steel or 2. concrete
is basic cost of the material includes tax?
Required concret Surface Temperature prior to coating of epoxy pain with references ASTM or ACI whatever
If we have the center line of the Finnish road level and we want to know what level of pay would have offset the Lhs and Rhus RHS 1,2.5,5 1,2.5,5 m.