Answer Posted / tamilmani
10
| Is This Answer Correct ? | 3 Yes | 13 No |
Post New Answer View All Answers
Iwant to calculate the production of 1 labour for concrete casting which includes shuttering,scaffolding,steel fixing,concreting, deshuttering and curing in 8hours.But i am not able to determine it approximately would you pls.??
IS code for Rolling Margin of steel
How to calculate the crank rod in slab
why & what is perchatage we are using fly ash in concrete?
What is the thickness of slab for 600 sq each) 2 slab construction. What should be the size of steel rod?
Dear Engineers, Can you please advise me the material requirement to construct a room 4 M x 4 M 1. No. of Standard Brick 2. Requirement of Cement Bags 3. And Concrete for Steel, Cement, sand, etc Thanks
What is meant by scaffolding coefficient?
What is modular elasticity?
acceptance criteria for concrete works
1.Fe500 and Fe550 having more yield strength than Fe415.But why are we prefering Fe415.? 2. d^2/162 formula for knowing the steel wt/m apply all these three? Thanks.
Define What is the origin of name Railway Sleepers?
How many cum of 9.5mm stone in 1 ton ?
Hi I had missed my mark list (first year-apr2003)how i search in my old mark details in internet and which web site? pl inform me in full details..
My daily concrete volume of M25 concrete is 1st day= 25 Cum 2nd Day = 45 Cum 3rd Day = 55 Cum 4th Day = 22 Cum 5th Day =72 Cum 7th Day = 49 Cum. What will be acceptance criteria of concrete considering as per is 456 cl.15 and table 11 (cl 16.1 and 16.3).
How is the leaning tower of pisa supported?