Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

how to calculate upthrust pressure of under ground water
tank in wet soil?

Answer Posted / devineni

upthrust pressure =soil wt/m3 sp gravity x height

Is This Answer Correct ?    3 Yes 3 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

What does a construction cost covers and what does not?

1186


Define What is the origin of name Railway Sleepers?

1267


Explain the latest method to detect a crack in a building?

1152


How do you calculate load bearing capacity of a waffle slab?

2669


use ofr concrete as per grade ?

2067


what is the Purpose of Adding 20% of wet mortar & 1/3rd to Dry Mortar for PCC & Plastering & Rcc .is there any standard method for adding this .?

2286


what would be the design load of R.C.C Cooling tower per cell.?

1990


what is the difference between replacement of cement by groundnut shell ash

3187


what is difference between GTS bench mark and temporary bench mark

5058


very simple or less time consuming formula for reinforcement calculation by moment

1470


For the symmetrical continuous beam shown in figure, Prestressed with a force P = 1500 KN along parabolic curve as shown, compute the extreme fiber stresses over the central support for the uniformly distributed load of 24 kn/m. Use load balancing method.

2092


How can you produce desired alloys and discuss their applications in daily life.

1204


if a pipe those configuration (ASTM c 76 class b 450mm dia 2500mm length) fixing for water course those lining of water is 7000 running meter. my question is that if 8 joints of pipe ls leakage and we have not permission to stop the water so which treatment we apply on joint in that in condition.

2110


how to clculate the %of concrete strenght achive after curing?load

2416


how to prepare site mix design

1937