Answer Posted / premkumar
Cement required water for chemical action to achieve
strength. Minimum requirement of water is 30% by weight of
cement and workability for concrete also important so adding
more water which is not good for concrete and unavoidable.
Now a days Admixer is available and using for workability
for concrete for any cementenious works.
| Is This Answer Correct ? | 2 Yes | 0 No |
Post New Answer View All Answers
How to marking the building
What is dead load impact load live load
Did any of the egyptian pyramids ever fall down?
I have completed building maintenance course in mcvc stream .. can I apply for the post of " sthapstya abhiyantriki sahayyak"?
what r you reqired for concrete baching plant?
how to calculate the dry wt of sand and cement for a required design mix?for ex:M20
can you mail me detailed procedure,entire syllabus and practice papers of mpsc civil engineering branch.I am in third year now
Material calculation of cm 1:6 for 1sqm
I want to know about rolling margin of steel :- For eg. If 2nos. bundle of 8mm dia steel with17 rods each of length 12m comes to store. During testing of 1m rod of each bundle it was found that 1rod has weight .405kg/m while other has .385kg/m. Now what will happen in case of steel payment and measurement payment ? Regards,
You have 3 snd sample of different FM=0.21,FM=0.95,FM=2.90 which one is suitable for a)plastering on R.C.C b)plastering on masonary wall c)concreting column d)concreting of bored pile.also justify your answer.
What is the use of extend command?
trapozidal
Suppose a new brick wall is being constructed,and the courses and not aligned horizontally,what negetives can it cause?
The foundations are placed below ground level, to increase?
what is anchorage length,lap length and (dont remember the last one)