How to Concrete cube test method and required result in
3days & 7days & 28 days, for all grade of concrete which
refer the is code no.
Answer Posted / arivazhagan
3 day 1/3 rd strength
7 day 2/3 rd strength
28 day full strength
| Is This Answer Correct ? | 3 Yes | 1 No |
Post New Answer View All Answers
What does a construction cost covers and what does not?
What year was the keystone power plant in Indiana County constructed?
There are two buildings one taller and one shorter whose time period will be grater and similarly the frequency ?
What are the uses of layer?
what is civil engineer greatest strength and weakness?
Water filter calculation formula
What is the cost of formwork for columns/beams/rcc walls also what is the cost of shuttering for roof slab at height of 25 feet
what is the types of door's wood?
relation bet Coefficient consolidation Cv, time factor Tv, drainage path d, & time t is Cv=d2Tv/t Cv=d2t/Tv Cv=tTv/d2 Cv=Tv/td2
I have an span length 16 ft c/c
What is the substitute of Mastic Asphalt?
In few lines, please be elaborative on extras and talents that make you a potential candidate for the post:
What are the points to be considered for calculating cement reconciliation. a)Do we need to deduct the wt of cement bags b)Do we need to adjust the qty due to wt loss during transportation, loading unloading etc or else each bag can be considered as 50 kg bag c)What is the proportion of mix cover block making.
Determine the production capacity of a treatment plant for a city of 1,250,000 population. Assume the specific consumption per capita of 15ol/c/d, non-domestic water use of 30,000,000 m³/year, and UFW of 12%.
what is the formula to find the diagonal shape stirrups?