What is the difference between "working stress method"
And "limit state method"?

Answer Posted / adam iqbal

In working stress approach, service loads are used in the whole design and the strength of material is not utilized in the full extent. In this method of design, stresses acting on structural members are calculated based on elastic method and they are designed not to exceed certain allowable values. In fact, the whole structure during the lifespan may only experience loading stresses far below the ultimate state and that is the reason why this method is called working stress approach. Under such scenario, the most economical design can hardly be obtained by using working stress approach which is now commonly used in the design of temporary works.
In limit state approach, for each material and load, a partial safety factor is assigned individually depending on the material properties and load properties. Therefore, each element of load and material properties is accurately assessed resulting in a more refined and accurate analysis of the structure. In this connection, the material strength can be utilized to its maximum value during its lifespan and loads can be assessed with reasonable probability of occurrence. Limit state approach is commonly used for the majority of reinforced concrete design because it ensures the utilization of material strength with the lowest construction cost input.

Is This Answer Correct ?    9 Yes 2 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

usually hand broken stones are used for cement concrete 1:4:8 in foundation of single /two story houses with a view of economy in construction.what advantages it will give if you use machine crushed stone in place?

1695


How to avoid fly ash seed ball formations in the concrete mixer while mixing of raw materials for fly ash block manufacturing?

1444


what is the procedure of wet seiving. n percentage of silt in different type of soil?

2169


how to do sudoko puzaals?

1831


why we create short columns under grade slab?

1842






for 16mm thick cement plastring 1:6 on 100 Sq.m.New brick work,the quantity of cement required is.

1518


how do you stabilize a waterlogged area in road construction

6304


What are advancements in civil engineering?

647


in plate load test what is the thickness of plate 20mm 5mm 50mm none

1710


As we know that steel is a tension member but why we are using STRUCTURE STEEL as a COLUMN (Without concrete) where column is a compression member and compression strength of steel is very low

1067


What are the techniques to measure road difference?

756


how to calculate the dry wt of sand and cement for a required design mix?for ex:M20

2109


What are the alternate material for steel, Sand and aggregate

1828


What should be the standard roof height like to be?

667


What is critical path method (c.p.m)?

697