What is the difference between "working stress method"
And "limit state method"?
Answer Posted / adam iqbal
In working stress approach, service loads are used in the whole design and the strength of material is not utilized in the full extent. In this method of design, stresses acting on structural members are calculated based on elastic method and they are designed not to exceed certain allowable values. In fact, the whole structure during the lifespan may only experience loading stresses far below the ultimate state and that is the reason why this method is called working stress approach. Under such scenario, the most economical design can hardly be obtained by using working stress approach which is now commonly used in the design of temporary works.
In limit state approach, for each material and load, a partial safety factor is assigned individually depending on the material properties and load properties. Therefore, each element of load and material properties is accurately assessed resulting in a more refined and accurate analysis of the structure. In this connection, the material strength can be utilized to its maximum value during its lifespan and loads can be assessed with reasonable probability of occurrence. Limit state approach is commonly used for the majority of reinforced concrete design because it ensures the utilization of material strength with the lowest construction cost input.
| Is This Answer Correct ? | 9 Yes | 2 No |
Post New Answer View All Answers
the volume of cement req for 70cum of brickwork in 1:6 cement mortar is approx is equal to 3cum 5cum 7cum 1ocum
What sizes of stones chips are used for foundation, column and floor casting. Please answer in detail.
How foundation is designed, Column design and beam design
What is absolute pressure? How absolute pressure is calculated?
how to calculate the mortar for 10'*10' size room for both plastering and for masonry work?
What is the quantity of cement in mix m20 concrete?
while doing the structural works of a simple ground+1 villa, can the columns be continued immediately after neck columns without tie beam, while the tie beam to be done after columns concreting.
What is the value of live load that should be incorporated in design of locker room and cash vault room while designing a building for commercial bank?
how much cement and sand required for 100sqm of wall plastering in different proportions
Civil engineering related
How much cement and sand required for 9"brick wall per square metre
Pls help me to arrive the rates for centering shuttering for highbay using H-frames?
Define What is the distance between railway tracks?
in staad pro. modelling for a parallel scissors chord truss, when i assigned roller support i.e fixwd but with all Fx, FZ, Mx, My and Mz release except Fy... the analysis results " in stability at a joint, with direction Mx or My..what could be the reason...anyone please explaing
Define What are the materials used in building a gravity dam?