If every alternative letter starting from B of the English
alphabet is written in small letter, rest all are written in
capital letters, how the month "September" be
written. (1) SeptEMbEr (2) SEpTeMBEr (3) SeptembeR (4)
SepteMber (5) None of the above.
Answer Posted / juned a hashmi
Every alternative letter starting from B of the English
alphabet is written in small letter, that means odd
positions are capital and even positions are in small.
Now,
S e p t e m b e r
19 5 16 20 5 13 2 5 18
S E p t E M b E r
Hence, September be written as SEptEMbEr
Is This Answer Correct ? | 34 Yes | 5 No |
Post New Answer View All Answers
what are the tables in testcases?
Mention what are the types of documents in sqa?
Explain the types of documents in software quality assurance?
We have a directory structure /usr/local/jboss/server/{$app_name}/log/*.log which contains 1000 log files. A web application has been logging to the cloud.log file, the attempts of a user called test. The code logs the following way: log.debug(username); where the username equals “test”. What command line application and or combinations of applications will you call in order to create a file named user_log.csv that contains the following lines, where the timestamp is sorted: timestamp,username
Explain insurance project modules,and what we need to test on which functionality?
Hi I have found a web site of online shopping (www.safetots.co.uk).PLEASE write possible "Test scenario" by seeing that site.Please make the end of mine and others doubt in Test scenario.Thanks in advance.
Explain the benefits of destructive testing.
Will automated testing tools make testing easier?
Explain what is bug triage?
Define test strategy.
What is Defect Density ? What is the formula? Explain with example
hello.. i have learnt testing manual and automation tools and im working as test engineer in a software company still i do need more testing skill so where can i get more knowledge about testing . please advice me
What is the rule of a "test driven development"?
What are the tests activities that you want to automate in a project?
can you explain the software testing life cycle?