4. What is your philosophy / attitude towards work?
Answer Posted / riyas
work is worship
| Is This Answer Correct ? | 1 Yes | 0 No |
Post New Answer View All Answers
2. What are the advantages of your present job, things you like about it?
can we compare the combined core of DBM and BC density with average density of Lab DBM and Lab BC density
How to calculate carrying capacity of the existing water supply trunkmain
is there any influence of water(used for mixing of concrete) on a weight of harndend concrete.
how to do cementicious paint for rcc walls of cw pump house
WHERE CAN I GET THE PREVIOUS QUESTION PAPERS OF APGENCO FOR THE THE POST OF Tr.ASSISTANT ENGINEER(CIVIL)
if a pipe those configuration (ASTM c 76 class b 450mm dia 2500mm length) fixing for water course those lining of water is 7000 running meter. my question is that if 8 joints of pipe ls leakage and we have not permission to stop the water so which treatment we apply on joint in that in condition.
How much cement and sand are required for 1 square feet of plaster at a thickness of 15 mm at a ratio of 1:4?
HOW MUCH STEEL REQUIRED FOR SLAB OF AREA 23'3"*18.3"? FOR SLAB HOW MUCH DIAMETER BAR WILL USE?
Sometimes the side of concrete bridges is observed to turn black in color. What is the reason for this phenomenon?
cause of cylinder test failure
I have completed building maintenance course in mcvc stream .. can I apply for the post of " sthapstya abhiyantriki sahayyak"?
why we can use dust in concrete insted of fly ash
Which ratio use for cement selery???
Define What is the difference between routing maintenance and major maintenance in school facilities?